Central Michigan University – Bioscience Building

Location: Mount Pleasant, MI                                                                                               
Completion Date: September 2016
Project Architect: Stantec                                                                                               
Construction Manager: Clark Construction Company
Project Description: Construction of a new 5 story 160,000 square foot state of the art Bioscience Building.
MHG’s Scope of Work:                                                                                               
Entire exterior building envelope including the following:
- Approximate contract value: $6.0 Million 
- Approximately 53,000 sf ft. of custom aluminum curtainwall
- Approximately 19,500 sf. ft. of custom terracotta panels
- Approximately 11,000 sq. ft. of decorative break shape wall panels
- Approximately 10,000 sq. ft. of zinc composite metal wall panels
- Air vapor barrier from roof to foundation
- Exterior metal cladded insulated wall panels and column wraps
- Aluminum fixed Louvers
- Exterior FRP Doors, frames and hardware
- Exterior Automatic Entrance Doors and Hardware
- Exterior Aluminum Doors and Hardware
MHG Partners:
-YKK AP America Inc.                                                                                               
-Oldcastle Building Envelope                                                                                               
-Davenport Masonry Inc.                                                                                               
-Shaffner Heaney Associates, Inc. 
-Alply Insulated Panels LLC                                                                                               
- Progressive door hardware                                                                                               
- Aluminum Supply Co.                                                                                               
- Rice Engineering                                                                                                
Category: Educational

University of Notre Dame Crossroads

Location: Notre Dame, Indiana                                                                            
Completion Date: August 2017                                                                       
Project Architect: S/L/A/M Collaborative                                 
Construction Manager: Barton Malow                               
Project Description: The University of Notre Dame’s largest construction project in university history. The monumental project encompasses over 750,000 sq ft  of space at a projected cost of $400 Million.                                               
MHG’s Scope of Work:                                                      
-Approximate contract value: $7.5 Million 
-Approximately 46,000 sqft of custom aluminum windows inclusive of receptors and pannings to conform with historic university standards
-Approximately 10,000 sf ft of custom stick built aluminum curtainwall located at field side suites
-Exterior Hollow Metals Doors, frames and hardware
-Exterior Wood Entrance Doors and Hardware
-Exterior Aluminum Doors and Hardware                    
-Exterior Overhead Coiling Doors                               
-Exterior glass guardrails
MHG Partners:
-Wausau Windows                                                                                                   
-Tubelite                                                                                                               
-Viracon                                                                                                 
-SC Railings                                                                               
-Glass and Mirrorcraft                                                                      
-Central Indiana Hardware                          
Category: Educational

Wayne County Community College Northwest Campus Replacement

Location: Detroit, Michigan 
Anticipated Completion Date: November 2012
Project Architect: Hamilton Anderson
Construction Manager/General Contractor: Sorensen Gross Construction Services
Project Description: New 100,000 sq ft 3 Story Building for study of Health Sciences. 
MHG Scope: includes exterior curtainwall, terra cotta rainscreen system inclusive of back up support members and 3” insulation. Additional scope consist of interior all glass storefronts, interior aluminum storefronts and glass guardrails.

Installation of exterior curtainwall is approximately 95% complete with terra cotta installation approximately 70% complete.

45,000 sq ft of exterior façade (curtainwall and terracotta) materials installed in under 6 months.

Category: Educational

Yost Ice Arena

Location: Ann Arbor, Michigan
Anticipated Completion Date: September 2012
Project Architect: Rossetti
Construction Manager/General Contractor: University of Michigan Facilities Group
Project Description: Exterior Window Replacement with new aluminum windows and a custom light diffusing glazing infill. Approximately 14,000 sq ft of new windows. Work started June 2012 and must be complete by September 2012 to open for the 2012 hockey season.