Projects in Progress

Sort By Categories:


Category: Healthcare

Dixie Brewery

Location: New Orleans LA
Completion: September 2016
General Contractor: Clark McCarthy Health Care Partners
Description: Southeast Louisiana Veterans Healthcare System Replacement Hospital
-Ground up Research Building 8 and renovation of historic Dixie Brewery
MHG Scope of work:  Approximately 4 million
-Unitized curtain wall and window openings, fire safing, exterior aluminum entrances, interior trims
MHG Vendors: Erie Architectural Products, Viracon, Progressive Hardware, YKK

 

Category:

East Campus Building 1

Location: Fort Meade, Maryland

Completion Date: March, 2016

Owner: US Army Corps of Engineers                                 

Construction Manager: Walsh Federal LLC                             

Project Description: East Campus Building 1 is a 148,432 gross sq. ft., four story office/industrial multiuse facility on Ft. Meade, Maryland. Projected cost 91,777 million.        

MHG’s Scope of Work:                                                      

-Approximate contract value: $3.5 Million 

-Approximately 33,000 sf of custom high performance curtain wall system to meet requirements for Impact Resistance, Blast Mitigation or both, custom 1 5/16” Low E exterior lite, and an additional 9/16” Laminated Inboard lite for STC Rating.

-Exterior: Custom Sunshades

-Exterior: Custom Blast resistant Aluminum Entrance Doors with hardware and blast resistant glazing

Interior: 14” X 154” Fire-rated STC Hollow Metal Frame and Glass Frame Assembly

Interior: Custom Decorative Glass behind drinking fountains

MHG Partners:

-YKK AP America Inc.

-JEBerkowitz Architectural Glass                                                                                                               

-McGill  Architectural                                                                                              

-Krieger Specialty Products

-Nathan Allan Glass Studios Inc.

Category: Educational

Central Michigan University – Bioscience Building

Location: Mount Pleasant, MI                                                                                               
Completion Date: September 2016
Project Architect: Stantec                                                                                               
Construction Manager: Clark Construction Company
Project Description: Construction of a new 5 story 160,000 square foot state of the art Bioscience Building.
MHG’s Scope of Work:                                                                                               
Entire exterior building envelope including the following:
- Approximate contract value: $6.0 Million 
- Approximately 53,000 sf ft. of custom aluminum curtainwall
- Approximately 19,500 sf. ft. of custom terracotta panels
- Approximately 11,000 sq. ft. of decorative break shape wall panels
- Approximately 10,000 sq. ft. of zinc composite metal wall panels
- Air vapor barrier from roof to foundation
- Exterior metal cladded insulated wall panels and column wraps
- Aluminum fixed Louvers
- Exterior FRP Doors, frames and hardware
- Exterior Automatic Entrance Doors and Hardware
- Exterior Aluminum Doors and Hardware
MHG Partners:
-YKK AP America Inc.                                                                                               
-Oldcastle Building Envelope                                                                                               
-Davenport Masonry Inc.                                                                                               
-Shaffner Heaney Associates, Inc. 
-Alply Insulated Panels LLC                                                                                               
- Progressive door hardware                                                                                               
- Aluminum Supply Co.                                                                                               
- Rice Engineering                                                                                                
Category: Educational

University of Notre Dame Crossroads

Location: Notre Dame, Indiana                                                                            
Completion Date: August 2017                                                                       
Project Architect: S/L/A/M Collaborative                                 
Construction Manager: Barton Malow                               
Project Description: The University of Notre Dame’s largest construction project in university history. The monumental project encompasses over 750,000 sq ft  of space at a projected cost of $400 Million.                                               
MHG’s Scope of Work:                                                      
-Approximate contract value: $7.5 Million 
-Approximately 46,000 sqft of custom aluminum windows inclusive of receptors and pannings to conform with historic university standards
-Approximately 10,000 sf ft of custom stick built aluminum curtainwall located at field side suites
-Exterior Hollow Metals Doors, frames and hardware
-Exterior Wood Entrance Doors and Hardware
-Exterior Aluminum Doors and Hardware                    
-Exterior Overhead Coiling Doors                               
-Exterior glass guardrails
MHG Partners:
-Wausau Windows                                                                                                   
-Tubelite                                                                                                               
-Viracon                                                                                                 
-SC Railings                                                                               
-Glass and Mirrorcraft                                                                      
-Central Indiana Hardware                          
Category: Aviation

Bishop International Airport

Location: Flint, Michigan
Anticipated Completion Date:October 2012
Project Architect: RS&H out of Jacksonville, FL
Construction Manager/General Contractor: Sorensen Gross Construction Services out of Flint, MI
Project Description: 47,000 sq ft 4 gate addition to the existing terminal Curtainwall installation at the new addition was completed on schedule. Interior glass scope of work on going with a projected completion of September 2012. Project features 6,000 sq ft of inverted exterior curtainwall along with custom laminated radius all glass feature wall and all glass automatic sliding doors.