Completed Projects

Sort By Categories:


Category: Educational

Washtenaw Community College Green Parking Deck

Location: Ann Arbor, Michigan
Project Architect: Rich and Associates
Construction Manager/General Contractor: Colasanti
Project Description: New Space Parking Deck along with connecting bridge to existing building
MHG Scope: 5,000 sq ft of custom Oldcastle curtainwall, 2,000 sq ft custom barrel vault skylight by Super Sky Products
Category: Hospitality

Hollywood Casino

Location: Toledo, Ohio
Completion Date: May 2012 
MHG Scope: Exterior Curtainwall, Storefront and Entrances at both the parking garage and main casino building. Interior Aluminum Entrances and Storefronts. Interior Custom All Glass Entrances and Storefronts

Category: Retail

Apple Somerset

Location: Troy, Michigan
Construction Manager/General Contractor: Pepper Construction
Project Description: Successfully completed installation of glass storefront and support structure. Comprised of 4 lites of 13/16” Starphire Laminated glass each approximately 132” x 120” set in custom stainless steel channels and overhead automatic sliding tracks.

Category: Government

Department of Defense (BRAC 133)

Location: Alexandria, Virginia 
Completion Date: September 2011
Project Architect: HKS Inc
Construction Manager/General Contractor: Clark/Shirley JV
MHG Scope: 8,000 sq ft of high blast curtainwall from YKK AP. 1 5/16” Viracon Insulated Laminated Glass. 21,000 + sq ft of Custom Painted Reynobond composite panels and column covers. Interior Ballistic resistant entries and storefronts.
Successfully completed on schedule in accordance with BRAC mandated dates.

Category: Mixed Use/Residential

Metro Lofts

Location: Royal Oak, Michigan